 |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
Mezzine Flooring Systems
Innovative Design, Technical
know-how
and a product range
to
back-it, that's a
UNI-Floor
mezzanine Floor...
 |
Our designs, using the latest CAD facilities can optimise the layout of raised storage platforms, office space and accommodation or workshop areas, with maximised access on the lower level. Racking and storage can be provided within the lower level to give maximum cost effective use of the area. |
Steel columns support steel main beams and a choice of deck surfaces are available to suit the application. Local authority regulations and various codes of practice, including fire protection, may be specified.
Purpose built workshops manufacture a full range of floor tile types from a few hundred to many thousands of square feet. Both structural design and fabrication facilities are available in-house providing close co-operation between design and the manufacturing unit to give hands-on control over all areas of production.
Skilled and experienced installation teams work with the minimum of disruption to provide a purpose built floor to meet your demands. All UNI-Floor systems may be extended at a later date to match current needs and budgets available.
Contact our Customer Services Department - we will give you helpful and friendly advice - as well as the best floor you can buy today!
|
Technical Specifications
A list of technical details is shown below. This diagram allows you to view certain elements of our UNI-Foor Mezzanine floors.
Please
Click on
the number
you
are interested in.
An image will
be displayed
below... |
|
Technical Information
- LENGTH, WIDTH, HEIGHT
To individual design and requirements.
- COLUMN SPACING
Can be most economical using equal grid spacing or unequal where necessary to suit customer's layout/requirement.
- MAIN BEAM
Hot roll steel.
- COLUMNS
Square tubular or I section hot rolled steel.
- SECONDARY JOISTS
Cold-rolled galvanised.
- LOADING
2.5 - 38.KN/m², (50 - 800 lb/ft²) normally 4.8KN/m² (100 lb/ft².)
- STAIRCASE
Fully welded all steel stringers and handrailing. Open tread type with steel treads.
- FIRE PROTECTION
Ceiling and column cladding available to provide 30, 60 and 90 minute fire protection.
- FLOORING
For wheeled traffic such as pallet trucks or point loads, specifically designed 38mm very heavy duty particle board. Also a choice of tongued and grooved ply, tongued and grooved flooring-grade chipboard, cold-formed steel planks, open-mesh steel, chequer plate etc.
- HANDRAILING
Hot rolled tubular top and knee rails supported by square tubular hot rolled posts with hinged loading gates when specified.
- FINISH
Industrial quality paint. Special paint finishes on request.
- OPTIONAL ITEMS
Ceilings, fascias, cat ladders, safety gates, top and mid landings, non-slip surfaces, partitioning Kick boards and fire protection.
- INSTALLATION
Experienced installation teams will ensure your mezzanine floor is correctly and safely installed.
|
Quality Manufacturing and Installation speaks for itself!
UNI-Floor structural floor.


UNI-Floor rack supported storage area

|
|
|
|
|
|